top of page

Round window build from shop work to installation.
This was completed in April 2025 and was for the First Reformed Church of Christ in Philadelphia (4th and Race St).

The old casing on top of the new casing.

The new casing and round window made from African Mahogany

Laying the old muntins on top of the new windows. 
I had to duct tape the old muntins together so they
didn't fall apart. 

The new muntin grid laid out and ready for site installation

The Installation of the round window.  

IMG_9913.jpg

Two pieces on there way into the attic.
 

The installation of the window popped right in without too much 
fuss.

Installation of the muntin grid and the glass and final shots. 

  • Facebook
  • Twitter
  • LinkedIn

©2019 by George Draguns. Proudly created with Wix.com

bottom of page